Bab El Bahr Hotel
Project Description
Rehabilitation and Repair of deteriorated Reinforced Concrete Elements of The Bab El Bahr Hotel, and also outside painting of the Hotel. In execution and quality and safety factors are maintained at all times.
The Work Consist
- Where the severely deteriorated ( element type 1, figA-7) pre-cast elements shall be removed completely and they will be replaced by similar new pre- casted arches placed into position.
- Repair of Moderately and Severely Deteriorated Pre-Cast Elements
- Repair of Severely Deteriorated R.C. Emergency Stair and Restaurant Columns
- Repair of Severely Deteriorated Restaurant R.C. Beams and above 0.40 m parapet, at the exterior face
- Repairs of All Balcony Wall Cracks, repair of the Basement Slab Soffit Cracks, Repair of Honeycombed Concrete, Repair of Deteriorated Utility Openings
- External Paints
Client
SOSIAL SECURITY FUND OF LIBYA
Date of Commencement
March, 2003
Date of Completion
December, 2004